Travelling Summer 2016 – Part 1: The journey to, and set up of, the EJC

My travels to the European Juggling Convention (EJC)began Friday the 22nd of July. I packed checked all my packed bags and travelled from Galway to Dublin with my companion to sleep for a few hours before getting up at 3.45am to go get the bus to the airport.

I got the 4.35am AirCoach from Cabinteely to Dublin Airport, T1. Coincidentally, my radio co-host and oldest friend was flying out the same day, and almost same time, from T1 – but to Japan.

imag3699

We only realised the timing about a week before so it was very amusing to navigate the airport together before our 7-ish a.m. flights.

imag3701

I arrived in Schipol Airport, Amsterdam, Netherlands, around 10.30am local time (GMT+1). At this time the  direct train was still available to Almere Poort, where the European Juggling Convention (EJC) site was, though I was a week early. I’d applied to assist site set-up but thought I was three days to early even for that.

imag3704

But I hopped off the train, and almost immediately had someone new come up to me, smiling, asking “You’re here for the EJC? Come on in!”. I later found out it was Tom, one of the five members of the EJC 2016 core team.

imag3812

I was introduced to the ten or so people currently on-site, given some water and coffee and asked if I’d like to start working now or later. So I started laying power cables immediately. One of my co-volunteers joked about how this was how he spent his vacation time; manual labour. And it was a great time!

imag3746_1

The weather was warm and the site was dusty from the lack of rain. None of the big tops were yet up. Everyone currently on-site, the core-team and five or six volunteers, ate together for breakfast, lunch and dinner. That evening set the tone for most for most of that week’s evenings; We sat around, people discussed their juggling clubs and circuses, people juggled and played instruments.

Everyday for the pre-EJC week more people would arrive until there was about eighty of us. The first few days were my favourite, when you knew everyone and worked the hardest, all day every day. Some days we took breaks if it got too hot during the day to work, and visited the lake nearby.

imag3767

During the week there was every kind of job to do, building fences, planning tent sites, painting signs, repairing the workshop sheet, building trusses, signage, laminating, registration packages….

And also hanging lamps!

And raising trusses and looking at new boards.

Then Saturday the 30th came to open up!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s